Preconstruction spec capture for every Vistaza job. Sign in with your Vistaza Google account.
PM Success
Owner
Projects
Pipedrive deals at the 30 for 30 stage appear here. Click a project to capture its spec.
—
—DRAFT v1
GapsCatalogDesign pressurePerformance classThermal U-factorWater test countSill pan flashing
Catalog
Requirements
Tests
Sections & flashings
Accessories
Sources
0 types
Project requirements — defaults the catalog inherits.
Design pressure · water test pressure · performance class · thermal · acoustic · air leakage. Phase 1 wave 2.
Tests — water · air · structural · mockup · other rows.
Each row references the standard, count, basis, pressures, location rule, and which catalog types it applies to. Phase 1 wave 3.
Sections & flashings — head, sill, jamb conditions; sill pan, head flashing, end dams, drip cap.
Each entry cross-references which catalog types it applies to. Phase 1 wave 4.
Accessories & finishes — screens, opening-control devices, special hardware, color matching, fall protection.
Per-type or project-wide. Phase 1 wave 5.
Sources — contract, spec sections (CSI 08 80 00), window schedule, schedule notes, building & wall sections, elevations, floor plans, detail sheets, design plans, finish schedule, RFIs, emails, verbal.
Each spec line links to ≥1 source for provenance. Phase 1 wave 6.